What do attendees need before a Claude build session?
Three things: their raw material, their accounts and a reference. For my Claude 101 session that meant a resume and a LinkedIn profile exported as PDF, free accounts on Claude, GitHub and Vercel, a Supabase account for the form, and the link to one website whose design they liked. Send the list a few days ahead. People who arrive ready spend the session building, not resetting passwords.
The checklist I send
- A laptop with a charger. Phones are not enough for a build session.
- Raw material: for a portfolio site, the resume and the LinkedIn profile exported as a PDF. For a product page, a one page brief with the offer, the audience and a few proof points.
- A Claude account, ideally signed in before the session starts.
- A GitHub account, so the site has a home and a version history.
- A Vercel account, signed in with GitHub, so publishing is one click.
- A Supabase account if the build includes a form.
- One reference website whose look they like.
Why the reference matters
The reference is the item people skip and the one that changes the result most. Without it, attendees describe the design in adjectives like clean or modern, and Claude returns something generic. With a link, Claude can study what actually makes the site work. In Claude 101 I used still.ag for a minimalist redesign and lennyrpg.fun for the gamified version, with the instruction to take inspiration and not copy.
What can wait for the session
Supabase does not need to be fully set up beforehand. A new project takes about two minutes to provision, and the table and security policy are part of what we learn together. A well built form also falls back to opening the visitor's email app until the keys are pasted in, so nobody is blocked.
What organisers should add
Tell attendees the exact start time in their time zone, whether cameras should be on, and that they will publish something publicly by the end. Knowing the work will be live changes how seriously people prepare.
On the day
Start with a two minute check that everyone is signed in to all accounts. Fix problems before the build begins, not halfway through.